Case study / Revamping of working hydropower plants (even with power exceeding 20MW)
The revamping of existing hydropower plants consists in the modernization of its electromechanical equipment: turbines, valves, servomechanisms, regulation and control panels.
Advanced reverse engineering activities lead to:
- Increasing efficiency
- Reducing environmental impact
- Increasing operation duration
- Time and maintenance cost reduction