Case study / Turn-key solutions for micro and mini hydropower plants

From 50 KW to 20 MW, this is the range within which we propose the most innovative and operative solutions.
The characteristics of every plant are thoroughly analysed and supervised with the aim of pinpointing the solution which best interprets the right balance between maximum performance and amount of investment.
Feasibility study and Project financing, Executive planning, Production of single electro mechanic equipment, Installation and Start-up: all stages of the project are supervised in our structure, in complete and constant synergy in all technical areas, thus guaranteeing high management efficiency that allows us to reach maximum reliability and quality maintaining an efficient cost control.

 

Copiright 2018 Italtechnics - privacy
Questo sito è stato realizzato con i contributi delle aziende associate a valere sui fondi POR FESR Umbria 2014-2020 – Az. 3.3.1 – BANDO RETI DI IMPRESE PER L’INTERNAZIONALIZZAZIONE – ANNO 2017 per la realizzazione del progetto: INTERNAZIONALIZZAZIONE RETE ITALTECHNICS – FOCUS NORD EUROPA E SUD AFRICA che comprendeva, tra le altre attività, l’implementazione del proprio sito web.